Rig Inspection
Course Description
Rig inspection and acceptance decides whether a rig arriving on contract is fit to spud or No, yet many acceptance surveys rely on generic checklists, miss worn drill line, untested brakes, overdue BOP recertification and loose items aloft, and end with findings lists that are never closed before operations start. This Core Concept course trains the people who inspect and accept rigs to plan surveys by rig type, check each rig system against defined criteria, classify findings and drive them to verified close-out. Participants produce a Rig Acceptance Inspection Plan and Findings Report.
The Training Course Will Highlight ?

Skills You Will Gain:


• Rig Acceptance Survey Planning
• Hoisting Equipment Condition Assessment
• Draw works and Brakes
• BOP Readiness Verification/ test
• Rig Power and Circulating System Checks
• Dropped Object Surveying
• Rig Findings Classification
• Acceptance Close-Out Tracking

Training Objective

  • Define the scope, team and document pack for acceptance, condition and periodic category inspections on land and offshore rigs
  • Inspect derrick or mast, draw works, drill line, blocks and top drive against load path, wear and brake criteria
  • Verify well control equipment readiness at inspection level through BOP configuration, accumulator drawdown and pressure test records
  • Check circulating, power generation and electrical systems, dropped object controls, lifting gear and rig safety systems against checklists
  • Classify findings by severity and set conditional acceptance, waiver and close-out requirements before spud
  • Compile a rig acceptance findings report with evidence references, action owners and a sign-off sequence

Target Audience

  • Rig superintendents and senior rig crew who prepare rigs for customer acceptance surveys
  • Drilling supervisors who represent the operator on the rig floor and sign off rigs before operations
  • QHSE staff who verify rig safety systems, dropped object controls and lifting operations
  • Asset integrity and maintenance staff who manage rig equipment condition, recertification and repair records
  • Contracts and rig-move coordinators who track equipment list compliance and outstanding findings

Training Methods

Daily Agenda

Day 1: Rig Types, Inspection Purposes and Survey Scope

  • Land, Jack-Up, Semi-Submersible and Drillship Layouts by Rig System
  • Acceptance, Condition and Periodic Category Inspection Comparison Grid
  • Contract Equipment List Review Against the Standard Format Equipment List
  • Rig Document Pack: Certificates, Maintenance Records and Recertification Status
  • Rig Acceptance Scope Statement and Inspection Team Roles Matrix

Day 2: Hoisting, Derrick and Rotating Equipment Inspection Criteria

  • Derrick and Mast Structural Checks: Bolted Connections, Pins, Deformation and Corrosion
  • Draw works Drum, Primary Brake and Auxiliary Brake Inspection Checklist
  • Drill Line Slip-and-Cut Records, Crown Block, Travelling Block and Deadline Anchor Checks
  • Top Drive Load Path, Guide Rails and Safe Working Load Verification
  • Hoisting Equipment Inspection Categories

Day 3: Well Control, Circulating and Power System Checks

  • BOP Stack Configuration Check: Annular, Pipe, Blind and Shear Ram Arrangement
  • Accumulator Unit Drawdown Test and Remote Control Panel Function Check
  • Choke and Kill Manifold, Lines and Valve Pressure Test Record Review
  • Mud Pumps, Standpipe Manifold, Pulsation Dampeners and Relief Valve Settings
  • Power Generation, Engine Shutdowns, Switchboards and Hazardous Area Electrical Equipment

Day 4: Dropped Objects, Lifting Gear, Safety Systems and Findings Classification

  • Dropped Objects Survey: Secondary Retention, Safety Nets and Tool Tethering
  • Lifting Gear Register, Crane Load Test and Pipe Handling Equipment Checks.
  • Gas Detection, Fire Suppression, Emergency Shutdown and Escape Route Verification
  • Findings Classification Matrix: Critical, Major, Minor and Observation
  • Conditional Acceptance Criteria, Waiver Requests and Pre-Spud Close-Out Rules

Day 5: Case Rig Acceptance Walkthrough and Findings Report

  • Case Rig Briefing: Equipment List, Maintenance History and Prior Survey Findings
  • System-by-System Inspection Walkthrough Using Photo and Test Data Evidence Sets
  • Findings Log Drafting With Evidence References and Severity Classification
  • Corrective Action Close-Out Tracker and Acceptance Sign-Off Sequence
  • Rig Acceptance Inspection Plan and Findings Report Presentation and Peer Challenge
Accreditation

CDGA attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
DE232-04 23-11-2026 Kuala-Lumpur USD 5950
DE232-01 11-01-2027 Kuala-Lumpur USD 5950
DE232-02 11-04-2027 Cairo USD 5450
DE232-03 11-07-2027 Manama USD 5450
DE232-04 10-10-2027 Muscat USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 23-11-2026
  • End date 27-11-2026

Venue
  • Country Malaysia
  • Venue Kuala-Lumpur

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

CDGA keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since CDGA was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Ireland, Ireland

3012, Block 3, 30 Euro Business Park, Little Island, Co. Cork, T45 V220, Ireland

+353 214 552955

Mon to Fri 09:00 AM to 06:00 PM

Info@cdga-training.com

Contact Us anytime!