Stuck Pipe: Well hole Problems Detection & Diagnostics
Course Description
This course will be all about prevention rather than cure. It will teach the complete process of detection, diagnostics, and resolution in a methodical way. The candidates will be working in teams to analyze real field cases and present their solution. The course will address advanced topics in hole problems such as depleted sands, supra and subsalt gouge zones, fractured rocks, salt problems, and HPHT drilling windows. In addition, the the candidates will learn how to perform the math required for diagnosing and resolving these problems. All causes of stuck pipe will be addressed, what causes each, how to identify them, what immediate action can be taken. It shows the role of each member of the rig team in the chain to facilitate proactive early diagnosis. This course is set apart from other traditional courses by its extensive use of integrated approach of data analysis and clever use of drilling trends and cuttings analysis. With your data, the course can be customized and past stuck pipe incidents can be utilized in the course.
The Training Course Will Highlight ?
Training Objective

By the end of this BTS training course, participants will be able to:

  • Address preventive measures to prevent the occurrence of stuck pipe
  • Learn how to minimize the frequency of stuck pipe
  • Learn how techniques of monitoring, diagnosis, and resolution
  • Adhere to best practices in all aspects of the well construction process

Target Audience

Drilling Engineers, Senior Drilling Engineers, Drilling Supervisors, Workover Engineers, Petroleum Engineers, Completion Engineers, Tool Pushers, Reservoir and Senior Reservoir Engineers, Geologists, Production Engineers, Wellsite Engineers, Foremen, Industry Personnel

Training Methods

Daily Agenda

A Primer on Well Planning

  • Well planning from pre drill to post mortem
  • Wellbore stability
  • Drilling fluid
  • Solids content of a drilling fluid
  • Drilling fluid properties trends
  • Real time trends
  • Drilling type curve analysis
  • Review of sticking mechanisms

Differential Sticking

  • Causes
  • Warning signs
  • Sticking force
  • Immediate action
  • Prevention
  • Class problems

Mechanical Sticking

  • Hole pack off
  • Wellbore geometry related sticking
  • Mobile formation
  • Bit balling

Fishing Operations

  • Steps to be taken prior to fishing
  • Free point
  • Zero tension at stuck point
  • Parting the stuck pipe
  • Backing off
  • Fishing and milling tools
  • Fishing economics

   Advanced Topics in Suck Pipe

  • Tracking stuck pipe probability while drilling
  • Stuck pipe in deviated wells
  • Stickiness’ factor
  • Liner sticking
  • Communication and personnel morals
  • Stuck pipe knowledge base 
Accreditation

CDGA attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
DE173-01 21-04-2025 Kuala-Lumpur USD 5950
DE173-02 27-07-2025 Dubai USD 5450
DE173-03 22-10-2025 Dubai USD 5450
DE173-04 14-12-2025 Riyadh USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 21-04-2025
  • End date 25-04-2025

Venue
  • Country Malaysia
  • Venue Kuala-Lumpur

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

CDGA keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since CDGA was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Ireland, Ireland

3012, Block 3, 30 Euro Business Park, Little Island, Co. Cork, T45 V220, Ireland

+353 214 552955

Mon to Fri 09:00 AM to 06:00 PM

Info@cdga-training.com

Contact Us anytime!