Introduction To Maintenance Of Aboveground Atmospheric Storage Tanks (API 653)
Course Description
API 653, Tank Inspection, Tank Repair, Tank Alteration and Tank Reconstruction, was first published by the American Petroleum Institute (API) in January, 1991. Its scope encompasses the maintenance, inspection, repair, alteration, relocation and reconstruction of existing, above ground, atmospheric storage tanks constructed per API 650, or its predecessor API 12C. If API 653 is intended to cover existing storage tanks, why should it be considered in the design of new storage tanks? For one simple reason: Ignoring API 653 when developing the design requirements for a new storage tank could result in operating or maintenance penalties later.
The Training Course Will Highlight ?

API 650 requires a minimum bottom plate thickness of 0.25 in. It does not mandate an internal lining, cathodic protection system, nor secondary containment and leak detection system. An owner wants to maximize the required interval between internal inspections, typically targeting for 10 years. The owner will typically be able to estimate anticipated corrosion rates for both the liquid and soil sides of the tank based on past experience. The question that must be answered is whether a standard API 650 tank design is acceptable, considering API 653 requirements and the owner's maintenance, inspection planning and operational requirements.

Training Objective

By the end of this course delegates will be able to:

  • Gain an overall understanding of the maintenance requirements of aboveground atmospheric storage tanks in accordance with API-653

Target Audience

Engineers, Supervisors, Inspectors, Maintenance Personnel and individuals who have engineering, inspection, maintenance and management responsibility related to aboveground atmospheric storage tanks that store hydrocarbon liquids

Training Methods

Daily Agenda

Introduction to API-653

  • Scope of API-653
  • Definitions
  • Starting an API-653 Compliance Program
  • Cost of an API-653 Compliance Program

Tank Inspection

  • Objectives
  • Prioritization
  • Inspection Frequencies
  • Record Keeping
  • Inspector Qualification

Tank Component Evaluation

  • Shell
  • Bottom
  • Nozzles
  • Roof
  • Foundation
  • Shell and Bottom Settlement

Leak Detection Methods

Tank Repair and Alteration

  • General Considerations
  • Material Considerations
  • General Requirements for Repair and Alteration
  • Removal, Repair and Replacement of Shell Plate Material
  • Repair, Addition, Replacement and Alteration of Shell Penetrations
  • Repair of Tank Bottoms
  • Tank Roof Repair

Dismantling and Reconstruction

  • Dismantling Methods
  • Reconstruction
  • Dimensional Tolerances

Examination and Testing

  • General
  • Welding Inspection
  • Hydrostatic Testing
Accreditation

CDGA attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
MI148-04 20-01-2025 London USD 6950
Prices doesn't include VAT

UpComing Date


Details
  • Start date 20-01-2025
  • End date 24-01-2025

Venue
  • Country United Kingdom
  • Venue London

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

CDGA keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since CDGA was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Ireland, Ireland

3012, Block 3, 30 Euro Business Park, Little Island, Co. Cork, T45 V220, Ireland

+353 214 552955

Mon to Fri 09:00 AM to 06:00 PM

Info@cdga-training.com

Contact Us anytime!