UPS Systems & Battery Chargers Maintenance & Troubleshooting
Course Description
A sudden loss of power will disrupt most business operations and could lead to a company being unable to trade. Where a company regards electrical power as critical then there will be a need for a continuous or back up power system. The installation of a UPS will provide the necessary continuity. There are however problems with these installations when there is a need for maintenance especially the use of by-pass. Power Quality compatibility problems may cause failure, which was the reason for the original UPS installation.
The Training Course Will Highlight ?
Training Objective

At the end of this course, participants will be able to:

  • Develop knowledge of the need for a UPS, types available, UPS components, batteries, generators and maintenance
  • Gain with new knowledge and skills that will enable them to understand more fully the requirements, roles and maintenance of UPS and battery systems
  • Understand the basis for the use of a UPS
  • Understand Critical Load Applications
  • Have an appreciation of Power Problems
  • Be able to review the installation and maintenance requirements of a UPS and Stand-by power installation
  • Be able to improve reliability by improving the resilience of an electrical installation

Target Audience

Electrical technicians, maintenance professionals and electrical engineers who would like to expand their knowledge of UPS systems

Training Methods

Daily Agenda

Introduction to the Resilient System

  • Introduction
  • Regulations
  • Critical loads
  • Purpose of an Installation
  • Compatibility
  • Protection and Devices
  • UPS or Generator
  • Maintenance

 

What is a UPS?

  • UPS Rating
  • Parallel systems
  • What is available
  • Maintenance by-pass
  • Off Line systems
  • Redundancy
  • On Line systems
  • Interactive systems

 

UPS Components

  • Transformer methods
  • Harmonics
  • Invertors
  • Twelve pulse rectifier
  • Phase control
  • Power factor
  • Six pulse rectifier
  • Static switch

 

Batteries

  • What is a battery?
  • Storage and Care
  • VLRA
  • Choosing a battery size
  • Size and location
  • Charging
  • Configuration
  • Battery safety

 

Generators and Site Planning

  • Do I need a Generator?
  • Environmental Constraints
  • Mains failure
  • Monitoring power
  • UPS Compatibility
  • Installing the UPS
  • Generator size considerations
  • Maintaining the UPS
Accreditation

CDGA attendance certificate will be issued to all attendees completing a minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
EE109-05 15-12-2024 Casablanca USD 5450
EE109-01 27-04-2025 Dubai USD 5450
EE109-02 28-07-2025 Istanbul USD 5950
EE109-03 19-10-2025 Dubai USD 5450
EE109-04 30-11-2025 Casablanca USD 5450
Prices doesn't include VAT

UpComing Date


Details
  • Start date 15-12-2024
  • End date 19-12-2024

Venue
  • Country Morocco
  • Venue Casablanca

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

CDGA keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since CDGA was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Ireland, Ireland

3012, Block 3, 30 Euro Business Park, Little Island, Co. Cork, T45 V220, Ireland

+353 214 552955

Mon to Fri 09:00 AM to 06:00 PM

Info@cdga-training.com

Contact Us anytime!