Gas Lift System Production Optimization
Course Description
This course addresses various areas of gas lifting operations. It gives a complete look on the operational activities which will enable field operators to fully optimize even from systems selection, design, and installation. Moreover, the course will then focus on the techniques in achieving production optimization, specifically with continuous flow installations, monitoring, and run-life optimization. In order to achieve optimal levels of production, NODAL analysis will be used in order to analyze and troubleshoot gas lifted wells. Class exercises and case studies will also be presented in order to test the candidates’ application of the concepts learnt in the course into situational instances of field operations.
The Training Course Will Highlight ?

The objective of this course is to provide comprehensive coverage of Gas Lift design in Production Optimization. The latest technology multi-phase flow and inflow well performance is covered. Continuous flow and intermittent lift including valve mechanics are emphasized. Theory and applications are balance throughout. Example problems are discussed and others worked out by participants.

Training Objective

By the end of this CDGA training course, participants will be able to:

  • Understand the techniques in gas lift system operations to achieve production
  • Learn to optimize production through gas lift system design, analysis, and troubleshooting
  • Apply techniques in gas lift operations from beginning to end of operations
  • Manage challenging environment faced by gas lifted wells
  • Overcome the limitations and problems faced in applying these optimization techniques
  • Optimize operations through understanding gas lifting’s role in the whole production system
  • Gain practical skills in valve mechanics and NODAL analysis
  • Integrate gas lift system best operation practices with production optimization

Target Audience

Drilling Engineers, Senior Drilling Engineers, Drilling Supervisors, Work over Engineers, Petroleum Engineers, Completion Engineers, Tool Pushers, Reservoir and Senior Reservoir Engineers, Geologists, Production Engineers & technologists, Well site Engineers, Lifting Personnel.

Training Methods

Daily Agenda
  • Artificial Lift Methods
  • Multiphase Flow in Oil Wells
  • Basics of Nodal Analysis
  • Gas Lift Installation Types
  • Gas Lift Valves & Construction
  • Design and Operation
  • Temperature and Effect on the Design
  • Setting and Testing
  • Continues Vs Intermittent Gas Lift
  • Operating Principles and Unloading
  • Valve Spacing
  • Optimization
  • Design of Continuous Flow Gas Lift Installations
  • Inflow Performance (IFP)
  • Reservoir Deliverability
  • Productivity Index and Vogel IPR
  • Effect of Reservoir Pressure and Water Cut
  • New Developments in Gas Lifting
  • NODAL Analysis of Continuous Flow Gas Lifted Wells
  • Optimization of Continuous Flow Gas Lift Installations
  • Unloading Design for Continuous Flow
  • Gas Lift Systems
  • Reciprocating Rod Lift
  • Progressing Cavity Pumping
  • Hydraulic Pumping
  • Electrical Submersible Pumping
  • Plunger and Capillary System
  • Analysis and Troubleshooting Continuous Flow Gas Lift Wells
  • Well Application and Trouble Shooting
Accreditation

CDGA attendance certificate will be issued to all attendees completing minimum of 80% of the total course duration.

Quick Enquiry

Request Info

Download Brochure Request In house Proposal

Course Rounds : (5 -Days)


Code Date Venue Fees Register
DE108-01 17-02-2025 Kuala-Lumpur USD 5950
DE108-02 13-07-2025 Dubai USD 5450
DE108-03 21-09-2025 Dubai USD 5450
DE108-04 24-11-2025 Istanbul USD 5950
Prices doesn't include VAT

UpComing Date


Details
  • Start date 17-02-2025
  • End date 21-02-2025

Venue
  • Country Malaysia
  • Venue Kuala-Lumpur

Quality Policy

 Providing services with a high quality that are satisfying the requirements
 Appling the specifications and legalizations to ensure the quality of service.
 Best utilization of resources for continually improving the business activities.

Technical Team

CDGA keen to selects highly technical instructors based on professional field experience

Strengths and capabilities

Since CDGA was established, it considered a training partner for world class oil & gas institution

Search For Available Course

Ireland, Ireland

3012, Block 3, 30 Euro Business Park, Little Island, Co. Cork, T45 V220, Ireland

+353 214 552955

Mon to Fri 09:00 AM to 06:00 PM

Info@cdga-training.com

Contact Us anytime!